The new Beaver Creek Fire Hall replaced the existing facility which was beyond its useful life and was completed prior to 1970.
The architectural program is separated into two functional elements located on two separate floors. The ground floor is comprised of the fire hall, EMS and SAR apparatus bays including adjacent support spaces and main entrance lobby for access to the remainder of the building. The second floor training room and adio Room provide meeting, operations and training spaces for the facility and are located next to a 12,000 L holding tank.
The form of the building responds to site conditions as well as to programmatic requirements. The roof plane folds to create height, volume and protective canopies in response to the program.
CLIENT
Government of Yukon
LOCATION
Beaver Creek
YEAR
2018